Here I hung two doors, one to replace to previous door the other where the door way had been blocked up and then revealed.
| The two new fitted oak doors |
| The new door, viewed from inside the front room.The door opens into the corridor as the room, at present, is used for storing work equipment. |
| The doorway into the front room had been blocked up.The builder had revealed the old opening. I fitted the lining and new door |
| Old door |